21YRS
WU JII INDUSTRY CO., LTD.
886-4-23593510
886-4-23593529
No. 1, 20th Rd., Industrial Park, Taichung City, Taiwan
www.wujii.com.tw

Products

Microclean Powder Metallurgy
S693 (M-4)
S693 (M-4)

Properties

High speed steel produced by powder metallurgy methods with highest wear resistance, red hardness and compressive strength.

The PM technology imparts to the material also excellent toughness and mach inability, e.g. highly satisfactory grind ability.

Application

Heavy-duty machining tools
E.g. tools for nonferrous metals such as titanium and aluminium alloys

Pinion type cutters of single or multi piece design
Side milling cutters, profile cutters, hob milling cutters
Broaching tools of all types
Chucking taps
Twist drills
Chasing tools
Reamers
Bimetal strips for saw blades
Tools used under extreme compressive stresses
E.g. precision blanking tools for high-strength materials.

Punches
Dies

Specification

HRC: 62-66

Heat treatment information

Heat treatment

Hot forming 
Forging

1100 to 900°C 
Slow cooling in furnace or in thermo insulating material.

Annealing

770 to 840°C 
Slow cooling in furnace. Hardness after annealing: max.280 Brinell

Stress relieving

600 to 650°C 
Slow cooling in furnace. To relieve stresses set up by extensive machining or in tools of intricate shape. After through heating, hold in neutral atmosphere for 1 to 2 hours.

Hardening

1150 to 1230°C 
Oil, salt bath (500-550°C), dry air blsast. Upper temperature range for parts of simple shape, lower for parts of complex shape. 
For cold working tools also lower temperatures are of important for higher toughness. Soaking time after heating up the whole section of a workpiece 80 seconds minimum is required for dissolving sufficient carbides. 
Maximum soaking time 150 seconds to avoid detriments by over soaking. In practice instead of soaking time the time of exposure from placing the workpiece into the salth bath after preheating until removing ( including the stages of heating to the specified surface temperature and of heating to the temperature throughout the whole section) is used. 
Vacuum hardening is also possible. The time in the vacuum furnace depends on the relevant workpiece size and furnace parameters. 

Tempering

Slow heating to tempering temperature immediately after hardening/time in furnace: 1 hour for every 20mm of workpiece thickness, but not less than 2 hours/ air cooling( minimum holding time:1 hour) 
1 st tempering and 2 nd tempering to desired working hardness 
3 rd tempering for stress relieving. 
30-50°C below highest tempering temperature 
Obtainable hardness after tempreing:64-66HRC

 

Mold
Machine
Vehicle
Contact Supplier
Browsing History
Scroll Up
EZB2B.TW uses cookies,IP to collect data and continually improve the website. By continuing to use this website, you must agree to the use of cookies and IP.